Slot drain construction detail


Secure drain sections to the stakes with the mounting holes provided on the levelling brackets.
Slotdrain is manufactured from sheet steel and is 100 recyclable.9) Once Slot Drain reglas para juego de poker is secured and the appropriate elevation is achieved, for structural support, tie the rebar from the dowels and floor grid into the rebar/levelling bars on the drain assembly.Gatic Slotdrain channels are suitable for applications up to F900 comprar loteria de navidad 00000 (depending on the system type).Retrofit, slot Drain Systems arrives at the site in fully assembled sections and is ready to be installed.First, bolt flange 4 of section 304 to the Slot Drain pit side marked.It takes two codigo descuento deporvillage foromtb people approximately 20 to 30 minutes to install one 15 foot section.The run-off capacity (Q) is measured in litres per second and is calculated thus.Site Work and Maintenance Guide, our illustrated literature includes advice and general information on safe handling, installation and maintenance of our Slotdrain products.3) Excavate the trench allowing for room underneath and on both sides of Slot Drain.8) Use wooden stakes to set the desired elevation of drain sections.2) It is recommended to pre-pour a concrete pad underneath the Slot Drain pit so it can be properly secured.1) Excavate a trench allowing for room underneath and on both sides of Slot Drain.

Drain sections arrive fully assembled and ready to install no grating to screw on, no anchors or drains to weld, simply bolt the drain ends together, then pour your floor.


Sitemap